Skip to content
Colocation · El Marqués, Querétaro, Mexico

KIO Networks Campus QRO1

Mexico's premier carrier-neutral interconnection campus anchored in the Bajio tech corridor

KIO Networks Campus QRO1
KIO Networks Campus QRO1 on the mapmap: Natural Earth (public domain)

The story

Located inside the Parque Industrial El Marqués in Querétaro, KIO Networks Campus QRO1 is the historical cornerstone that turned the state of Querétaro into Mexico's 'Data Center Valley'. Certified to ICREA Level 5 standards (guaranteeing 99.999% uptime), the campus operates as Mexico's core neutral interconnection crossroads. Sited over 1,800 meters above sea level on solid volcanic bedrock, QRO1 hosts primary banking transactional engines and core telecommunications backbones.

Notable

  • Holds ICREA Level 5 certification, certifying 99.999% high-availability fault tolerance.
  • Anchors the primary financial clearing and stock exchange disaster recovery systems for Mexico.
  • Houses dozens of national and international network carriers in a carrier-neutral ecosystem.
  • Pioneered the emergence of Querétaro as the primary data center hub of Mexico.

Expansions

  • 2017: Addition of QRO2 facility expanding multi-tenant high-voltage campus capacity
  • 2023: I Squared Capital multi-million dollar modernization program for AI density

Sources

  1. Centros de Datos KIO: Campus Querétaro QRO1 y QRO2 · KIO Networks · 2024-01-15
  2. Los centros de datos: el nuevo oro negro que impulsa a Querétaro · Forbes Mexico · 2023-08-14
  3. KIO Networks invertirá 400 mdd en expansión de centros de datos en México · El Financiero · 2022-11-08

Part of the open famous data centers dataset (CC BY 4.0). Updated 2026-10-15. A correction? da@mustardseedmt.com

Questions people ask
What is KIO Networks Campus QRO1 famous for?

Mexico's premier carrier-neutral interconnection campus anchored in the Bajio tech corridor

Where is KIO Networks Campus QRO1?

KIO Networks Campus QRO1 is in El Marqués, Querétaro, Mexico (20.575, -100.285). It is operated by KIO Networks.

How much power does KIO Networks Campus QRO1 use?

About 25 MW of IT load and 35 MW in total, according to the sources listed on this page.

What is the PUE of KIO Networks Campus QRO1?

1.35, reported.