Hyperscale · Sines, Alentejo, Portugal

Sines 4.0 (Start Campus)

Gigawatt-scale green campus cooled by deep Atlantic seawater and anchored by EllaLink

Sines 4.0 (Start Campus)
Sines 4.0 (Start Campus) on the mapmap: Natural Earth (public domain)

The story

Located along the rugged Atlantic shoreline of Sines, Portugal, Sines 4.0 (Start Campus) exemplifies the modern clean-energy transition. Built on land adjacent to a shut-down coal-fired power station, the campus repurposed the plant's massive industrial ocean water intake tunnels. Start Campus pumps deep, frigid Atlantic seawater through titanium heat exchangers to cool gigawatt-scale server rows without consuming a single drop of municipal freshwater, while landing EllaLink to Brazil.

Notable

  • Planned for up to 1.2 GW of capacity, making it one of the largest planned data campuses in Europe.
  • Repurposes heavy seawater cooling intake canals from a decommissioned EDP coal-fired power station.
  • Draws cold Atlantic ocean water directly to heat exchangers without consuming freshwater resources.
  • Directly connects to EllaLink, the transatlantic subsea cable linking Europe directly to Latin America.

Expansions

  • 2024: Commissioning of SIN01 building (15 MW operational phase)
  • 2026: Multi-phase ramp toward full 1.2 GW sustainable campus master plan

Sources

  1. Start Campus Sines 4.0: Sustainable Hyperscale Data Center · Start Campus · 2024-03-01
  2. Start Campus inicia operações do primeiro edifício do mega data center em Sines · Jornal de Negócios · 2024-01-30
  3. Start Campus switches on SIN01, first building of 1.2GW Sines facility in Portugal · DatacenterDynamics · 2024-02-05

Part of the open famous data centers dataset (CC BY 4.0). Updated 2026-10-15. A correction? da@mustardseedmt.com

Questions people ask
What is Sines 4.0 (Start Campus) famous for?

Gigawatt-scale green campus cooled by deep Atlantic seawater and anchored by EllaLink

Where is Sines 4.0 (Start Campus)?

Sines 4.0 (Start Campus) is in Sines, Alentejo, Portugal (37.936, -8.825). It is operated by Start Campus.

How much power does Sines 4.0 (Start Campus) use?

About 60 MW of IT load and 120 MW in total, according to the sources listed on this page.

What is the PUE of Sines 4.0 (Start Campus)?

1.1, design.