The story

Standing outside Grand Rapids, Michigan, the monumental seven-story pyramid of granite, steel, and reflective glass was built in 1989 as the high-tech development center for office furniture giant Steelcase. After sitting vacant, it was purchased by Switch founder Rob Roy, who converted the eccentric post-modern monument into an ultra-resilient Tier IV data center fortress. Operating on 100% renewable Michigan wind and solar, the Pyramid houses enterprise clouds and university clusters.

Notable

  • Originally built in 1989 for $111 million as the corporate R&D center for furniture giant Steelcase.
  • Converted by Rob Roy into an ultra-secure, Tier IV Gold resilient colocation facility.
  • Operates on 100% renewable power under Consumers Energy's certified green energy tariffs.
  • Features Switch's patented thermal containment chimneys and external multi-mode HVAC modules.

Expansions

  • 2021: Opening of the first adjacent 250,000 sq ft standalone data center shell building
  • 2023: Expansion of multi-tenant enterprise and university research cloud suites

Sources

  1. The Switch Pyramid Data Center Specifications · Switch · 2024-01-10
  2. Inside the Switch Pyramid: Transforming an architectural icon into a digital vault · MLive / Grand Rapids Press · 2017-05-18
  3. Switch Opens the Pyramid: Tier IV Cloud Hub in Michigan · Data Center Frontier · 2017-05-19

Part of the open famous data centers dataset (CC BY 4.0). Updated 2026-10-15. A correction? da@mustardseedmt.com

Questions people ask
What is Switch Pyramid Campus famous for?

Iconic 7-story granite corporate pyramid converted into an ultra-secure Tier IV data center

Where is Switch Pyramid Campus?

Switch Pyramid Campus is in Gaines Township, Michigan, United States (42.844, -85.642). It is operated by Switch.

How much power does Switch Pyramid Campus use?

About 50 MW of IT load and 65 MW in total, according to the sources listed on this page.

What is the PUE of Switch Pyramid Campus?

1.18, reported.